Data Collection
The PD team aim to run samples before the end of the merit round however this cannot be guaranteed as beamtime availability may be affected by unplanned beamline or machine problems.
Parameters for data collection need to be specified in the robot spreadsheet at the time the EA is submitted. These parameters cannot be changed once the EA is submitted.
All samples will be run using our robot at the next available beamtime and data will be available within ~2 weeks of the samples being run.
If the samples cannot be run within 2 weeks of the scheduled day then we will notify you. There is no reason to follow up with us before this time.